- Date: 2000
- Location: Marseille, France
- Phase: Completed
- Building Area: 70,000 m2
- Services Provided: Architecture, Interior design, Detailed design
- Parter in charge: Jean-Robert Mazaud
- Office: s'space France
Semi-open corridors provide a particular perspective for people, which makes people in the hallway can see these simple and easy operation’s machine directly: compost, rewinding, turbines, smoke processing, incineration, anaerobic digestion process. All these operations are linked with an antenna manipulation control room and a circular pit for trains unload garbage.